BIGMODEL?RUN THE MATHS
ANALYSIS · EDITORIAL CLASSIFICATION · NOT A BENCHMARK

DO I NEED THE BIG MODEL FOR…

Design a production forecasting approach

Frontier-model jobYES — USE THE STRONG MODEL

Model selection is cheap beside leakage, drift, and a bad evaluation design.

START WITH
THE WORK.

  1. 01

    The task requires several dependent reasoning steps.

  2. 02

    Several plausible interpretations can remain live.

  3. 03

    A plausible wrong answer could create material cost or harm.

RECOMMENDED SETUPStrongest suitable model + tools + task-specific evals
NON-NEGOTIABLE

Use temporal validation, a baseline, monitoring, and explicit failure modes.

REASONING5/5
AMBIGUITY4/5
ERROR COST5/5
CONTEXT5/5
CALCULATE THIS WORKLOAD →OPEN THE INTERACTIVE CHECKER →